| Name: Whitson, Peggy | Country: USA | M/F: F | Number of Flights: 2 |
| Space Flights | Launch Date - Flight Up | Landing Date - Flight Down |
|---|---|---|
| 1. ISS Crew 5 | June 5, 2002 - STS-111 (Endeavour) | December 7, 2002 - STS-113 (Endeavour) |
| 2. ISS Crew 16 | October 10, 2007 - Soyuz TMA-11 | April 19, 2008 - Soyuz TMA-11 |
| Space Flights | Descriptions |
|---|---|
| ISS Crew 3 (Backup Crew) |
ISS "Alpha" Expedition Crew 3 |
| 1. ISS Crew 5 | ISS "Alpha" Expedition Crew 5 Docked with the International Space Station (ISS) on June 7, 2002 aboard Endeavour as part of the STS-111 crew - Returned to Earth on December 7, 2002 aboard Endeavour as part of the STS-113 crew |
| ISS Crew 14 (Backup Crew) |
ISS "Alpha" Expedition Crew 14 |
| 2. ISS Crew 16 | ISS "Alpha" Expedition 16 Crew (ISS Crew Transfer Flight 15S) Docked with International Space Station (ISS) on October 12, 2007 aboard Soyuz TMA-11 Returned to Earth aboard Soyuz TMA-11 on April 19, 2008 |
| Spacewalks - 6 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| ISS Crew 5 | August 16, 2002 | International Space Station Assembly - Install six debris shields on the Zvezda Service Module |
| 4 hours 25 minutes | ||
|
|
||
| ISS Crew 16 | November 9, 2007 | International Space Station Assembly - Stow cables for the shuttle-to-station power transfer system. Stow avionics for the Pressurized Mating Adapter-2. Remove cover from Harmony's Common Berthing Mechanism. Reconfigure cables connecting Unity and the starboard truss and cables connecting Zarya to Pressurized Mating Adapter-1. Replace a remote power controller module |
| 6 hours 55 minutes | ||
| ISS Crew 16 | November 20, 2007 | International Space Station Assembly - Connect power and data cables for Loops A and B between the Harmony and Destiny modules. Connect cooling loops for Loop A between the Harmony and Destiny modules. Connect the power cables for the Station/Shuttle Power Transfer System between the Harmony and Destiny modules |
| 7 hours 16 minutes | ||
| ISS Crew 16 | November 24, 2007 | International Space Station Assembly - Connect cooling loops for Loop B between the Harmony and Destiny modules. Finish connecting the power cables for the Station/Shuttle Power Transfer System between the Harmony and Destiny modules. Inspect the starboard Solar Alpha Rotary Joint |
| 7 hours 4 minutes | ||
| ISS Crew 16 | December 18, 2008 | International Space Station Maintenance - Inspect the starboard Solar Alpha Rotary Joint. Inspect the Beta Gimbal Assembly on the S4-1A Solar Array Wing |
| 6 hours 56 minutes | ||
| ISS Crew 16 | January 30, 2008 | International Space Station Maintenance - Replace a faulty drive motor on Beta Gimbal Assembly on the S4-1A Solar Array Wing. Inspect the starboard Solar Alpha Rotary Joint |
| 7 hours 10 minutes | ||
| Return to Master List | American Astronauts | Two Spaceflights | Spacewalkers |
| Female Astronauts and Cosmonauts | |||
| International Space Station Program - Phase III - 2002 / Phase III - 2007 / Exp.-Crew / Backup Crew | |||
Updated - October 12, 2008