| Name: Tani, Daniel | Country: USA | M/F: M | Number of Flights: 2 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-108 | December 5, 2001 - Endeavour | December 17, 2001 - Endeavour |
| Space Flights | Launch Date - Flight Up | Landing Date - Flight Down |
| 2. ISS Crew 16 | October 23, 2007 - STS-120 (Discovery) | February 20, 2008 - STS-122 (Atlantis) |
| Space Flights | Descriptions |
|---|---|
| 1. STS-108 | ISS Utilization Flight UF-1 Delivered supplies in the Raffaello Multi-Purpose Logistics Module - Endeavour docked with the International Space Station (ISS) from December 7, 2001 to December 15, 2001. |
| ISS Crew 9A (Cancelled) |
ISS "Alpha" Expedition Backup Crew 9A Following the loss of Columbia, the original crew was replaced by the two person "caretaker" crew of Michael Fincke and Gennadi Padalka. |
| ISS Crew 11 (Backup Crew) |
ISS "Alpha" Expedition Crew 11 |
| 2. ISS Crew 16 | ISS "Alpha" Expedition 16 Crew Daniel Tani replaced Clayton Anderson as the third crew member of ISS Expedition Crew 16 on October 25, 2007 during the STS-120 mission and stayed aboard the International Space Station until the STS-122 mission. He was replaced by Léopold Eyharts. |
| Spacewalks - 6 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-108 | December 10, 2001 | International Space Station Assembly - Install insulation blankets around solar array steering mechanisms - Beta Gimbal Assemblies |
| 4 hours 12 minutes | ||
|
|
||
| ISS Crew 16 | October 28, 2007 | International Space Station Assembly - Disconnect cables, grounding straps, and bolts for the P6 Truss Segment relocation. Outfit the exterior of the Harmony module. Inspect the starboard Solar Alpha Rotary Joint |
| 6 hours 33 minutes | ||
| ISS Crew 16 | November 20, 2007 | International Space Station Assembly - Connect power and data cables for Loops A and B between the Harmony and Destiny modules. Connect cooling loops for Loop A between the Harmony and Destiny modules. Connect the power cables for the Station/Shuttle Power Transfer System between the Harmony and Destiny modules |
| 7 hours 16 minutes | ||
| ISS Crew 16 | November 24, 2007 | International Space Station Assembly - Connect cooling loops for Loop B between the Harmony and Destiny modules. Finish connecting the power cables for the Station/Shuttle Power Transfer System between the Harmony and Destiny modules. Inspect the starboard Solar Alpha Rotary Joint |
| 7 hours 4 minutes | ||
| ISS Crew 16 | December 18, 2008 | International Space Station Maintenance - Inspect the starboard Solar Alpha Rotary Joint. Inspect the Beta Gimbal Assembly on the S4-1A Solar Array Wing |
| 6 hours 56 minutes | ||
| ISS Crew 16 | January 30, 2008 | International Space Station Maintenance - Replace a faulty drive motor on Beta Gimbal Assembly on the S4-1A Solar Array Wing. Inspect the starboard Solar Alpha Rotary Joint |
| 7 hours 10 minutes | ||
| Return to Master List | American Astronauts | Spacewalkers | Two Spaceflights |
| International Space Station Program - Phase III - 2001 / Backup Crew / Phase III - 2007 / Exp.-Crew | |||
Updated - February 14, 2008