| Spacewalks by the STS-110 crew on ISS Assembly Flight 8A | |||
|---|---|---|---|
| STS-110 Launch: | April 8, 2002 | STS-110 Docking: | April 10, 2002 |
| STS-110 Undocking: | April 17, 2002 | STS-110 Landing: | April 19, 2002 |
| Spacewalkers: | Rex Walheim (STS-110) <> Steven Smith (STS-110) <> Lee Morin (STS-110) <> Jerry Ross (STS-110) |
||
| STS-110 Crew: | CDR Michael Bloomfield <> PLT Stephen Frick <> MS1 Rex Walheim <> MS2 Ellen Ochoa <> MS3 Lee Morin <> MS4 Jerry Ross <> MS5 Steven Smith |
||
| STS-110 Spacewalk 1 | Smith and Walheim attached the forward bipod mounting struts of the S0 Truss Segment (S0) to the Destiny laboratory. They deployed cable trays and connected cables between the S0 and Destiny, and attached the primary umbilical cable to the Mobile Transporter (MT). | ||
| Quest Airlock | |||
| April 11, 2002 | |||
| Length: 7 hours 48 minutes | |||
| Start: 14:36 GMT | |||
| End: 22:24 GMT | |||
| STS-110 Spacewalk 2 | Ross and Morin attached the aft tripod mounting struts of the S0 to Destiny. They removed launch support struts and beams on the S0 to allow movement of the MT. The backup umbilical cable was attached to the MT. | ||
| Quest Airlock | |||
| April 13, 2002 | |||
| Length: 7 hours 30 minutes | |||
| Start: 14:09 GMT | |||
| End: 21:39 GMT | |||
| STS-110 Spacewalk 3 | Smith and Walheim released launch restraint bolts on the MT. They rewired Canadarm2 to be powered by the MT, and released the capture claw that initially held the S0 to Destiny. | ||
| Quest Airlock | |||
| April 14, 2002 | |||
| Length: 6 hours 27 minutes | |||
| Start: 13:48 GMT | |||
| End: 20:15 GMT | |||
| STS-110 Spacewalk 4 | Ross and Morin installed the Airlock Spur from the S0 to Quest, floodlights on Destiny and Unity, shock absorbers on the MT, and performed various "get-ahead" tasks. | ||
| Quest Airlock | |||
| April 16, 2002 | |||
| Length: 6 hours 37 minutes | |||
| Start: 14:29 GMT | |||
| End: 21:06 GMT | |||
| Visited the ISS Crew 4 | |||
| ISS Crew 4 Launch: | December 5, 2001 | ISS Crew 4 Docking: | December 7, 2001 |
| ISS Crew 4 Undocking: | June 15, 2002 | ISS Crew 4 Landing: | June 18, 2002 |
| ISS Crew 4: | CDR Yuri Onufriyenko (Russia) <> FE1 Carl Walz (USA) <> FE2 Daniel Bursch (USA) | ||
| Spacewalks by the STS-111 crew on ISS Utilization Flight UF-2 | |||
|---|---|---|---|
| STS-111 Launch: | June 5, 2002 | STS-111 Docking: | June 7, 2002 |
| STS-111 Undocking: | June 15, 2002 | STS-111 Landing: | June 18, 2002 |
| Spacewalkers: | Philippe Perrin (STS-111) <> Franklin Chang-Diaz (STS-111) | ||
| STS-111 Crew: | CDR Kenneth Cockrell <> PLT Paul Lockhart <> MS1 Philippe Perrin (France) <> MS2 Franklin Chang-Diaz |
||
| STS-111 Spacewalk 1 | Chang-Diaz and Perrin installed a Power and Data Grapple Fixture on the P6 Truss Segment. They then stored a package of six debris shields on Pressurized Mating Adapter-1, and removed thermal blankets from the Mobile Base System (MBS). Chang-Diaz also inspected the failed Control Movement Gyro-1 in the Z1 Truss Segment. | ||
| Quest Airlock | |||
| June 9, 2002 | |||
| Length: 7 hours 14 minutes | |||
| Start: 15:27 GMT | |||
| End: 22:41 GMT | |||
| STS-111 Spacewalk 2 | Chang-Diaz and Perrin connected cables between the MBS and the Mobile Transporter, and tightened bolts to complete the installation of the MBS. They deployed a grapple fixture on the MBS that will allow the MBS to carry large payloads, and moved the MBS camera to its final location. | ||
| Quest Airlock | |||
| June 11, 2002 | |||
| Length: 5 hours 0 minutes | |||
| Start: 15:20 GMT | |||
| End: 20:20 GMT | |||
| STS-111 Spacewalk 3 | Chang-Diaz and Perrin replaced the wrist roll joint of the ISS's robotic arm (Canadarm2). | ||
| Quest Airlock | |||
| June 13, 2002 | |||
| Length: 7 hours 17 minutes | |||
| Start: 15:16 GMT | |||
| End: 22:33 GMT | |||
| Returned home the ISS Crew 4 | |||
| ISS Crew 4 Launch: | December 5, 2001 | ISS Crew 4 Docking: | December 7, 2001 |
| ISS Crew 4 Undocking: | June 15, 2002 | ISS Crew 4 Landing: | June 18, 2002 |
| ISS Crew 4: | CDR Yuri Onufriyenko (Russia) <> FE1 Carl Walz (USA) <> FE2 Daniel Bursch (USA) | ||
| Left off the ISS Crew 5 | |||
| ISS Crew 5 Launch: | June 5, 2002 | ISS Crew 5 Docking: | June 7, 2002 |
| ISS Crew 5 Undocking: | December 2, 2002 | ISS Crew 5 Landing: | December 7, 2002 |
| ISS Crew 5: | CDR Valeri Korzun (Russia) <> FE1 Peggy Whitson (USA) <> FE2 Sergei Treshchyov (Russia) |
||
| Spacewalks by the STS-112 crew on ISS Assembly Flight 9A | |||
|---|---|---|---|
| STS-112 Launch: | October 7, 2002 | STS-112 Docking: | October 9, 2002 |
| STS-112 Undocking: | October 16, 2002 | STS-112 Landing: | October 18, 2002 |
| Spacewalkers: | David Wolf (STS-112) <> Piers Sellers (STS-112) | ||
| STS-112 Crew: | CDR Jeffrey Ashby <> PLT Pamela Melroy <> MS1 David Wolf <> MS2 Sandra Magnus <> MS3 Piers Sellers <> MS4 Fyodor Yurchikhin (Russia) |
||
| STS-112 Spacewalk 1 | Wolf and Sellers connected power, data and fluid lines between the S1 and S0 Truss Segments. They installed a new S-band antenna and the first set of external cameras, and released the launch restraints on the Crew and Equipment Translation Aid (CETA) cart and the S1's radiators. | ||
| Quest Airlock | |||
| October 10, 2002 | |||
| Length: 7 hours 1 minute | |||
| Start: 15:21 GMT | |||
| End: 22:22 GMT | |||
| STS-112 Spacewalk 2 | Wolf and Sellers prepared the CETA cart for future use, hooked up ammonia supply lines to a radiator on the S1 Truss Segment. They installed 22 Spool Positioning Devices on the space station ammonia cooling line connections and an additional set of externals cameras on the Destiny laboratory. | ||
| Quest Airlock | |||
| October 12, 2002 | |||
| Length: 6 hours 4 minutes | |||
| Start: 14:31 GMT | |||
| End: 20:35 GMT | |||
| STS-112 Spacewalk 3 | Wolf and Sellers removed a bolt preventing activation of a cable cutter on the Mobile Transporter. They also connected ammonia lines between the S1 and S0 Truss Segments and installed additional Spool Positioning Devices. | ||
| Quest Airlock | |||
| October 14, 2002 | |||
| Length: 6 hours 36 minutes | |||
| Start: 14:11 GMT | |||
| End: 20:47 GMT | |||
| Visited the ISS Crew 5 | |||
| ISS Crew 5 Launch: | June 5, 2002 | ISS Crew 5 Docking: | June 7, 2002 |
| ISS Crew 5 Undocking: | December 2, 2002 | ISS Crew 5 Landing: | December 7, 2002 |
| ISS Crew 5: | CDR Valeri Korzun (Russia) <> FE1 Peggy Whitson (USA) <> FE2 Sergei Treshchyov (Russia) |
||
| Spacewalks by the STS-113 crew on ISS Assembly Flight 11A | |||
|---|---|---|---|
| STS-113 Launch: | November 23, 2002 | STS-113 Docking: | November 25, 2002 |
| STS-113 Undocking: | December 2, 2002 | STS-113 Landing: | December 7, 2002 |
| Spacewalkers: | Michael Lopez-Alegria (STS-113) <> John Herrington (STS-113) | ||
| STS-113 Crew: | CDR James Wetherbee <> PLT Paul Lockhart <> MS1 Michael Lopez-Alegria <> MS2 John Herrington |
||
| STS-113 Spacewalk 1 | Herrington and Lopez-Alegria connected power and data cables between the S0 and P1 Truss Segments. They also released launch restraints on the Crew and Equipment Translation Aid (CETA) cart and installed Spool Positioning Devices in the P1 and a Wireless video system External Transceiver Assemblies (WETA) on the Unity module. | ||
| Quest Airlock | |||
| November 26 - 27, 2002 | |||
| Length: 6 hours 45 minutes | |||
| Start: 19:49 GMT (Nov. 26) | |||
| End: 02:34 GMT (Nov. 27) | |||
| STS-113 Spacewalk 2 | Herrington and Lopez-Alegria connected fluid lines between the S0 and P1 Truss Segments, installed the second WETA on the P1 Truss Segment (P1) and relocated the CETA cart to the S1 Truss Segment. They also released launch restraints on the P1's radiators. | ||
| Quest Airlock | |||
| November 28 - 29, 2002 | |||
| Length: 6 hours 10 minutes | |||
| Start: 18:36 GMT (Nov. 28) | |||
| End: 00:46 GMT (Nov. 29) | |||
| STS-113 Spacewalk 3 | Herrington and Lopez-Alegria connected ammonia lines between the P1 and S0 Truss Segments and installed additional Spool Positioning Devices. Herrington installed a second UHF antenna on the P1, since the UHF antenna got in the way of the Mobile Transporter. | ||
| Quest Airlock | |||
| November 30 - December 1, 2002 | |||
| Length: 7 hours 0 minutes | |||
| Start: 19:25 GMT (Nov. 30) | |||
| End: 02:25 GMT (Dec. 1) | |||
| Returned home the ISS Crew 5 | |||
| ISS Crew 5 Launch: | June 5, 2002 | ISS Crew 5 Docking: | June 7, 2002 |
| ISS Crew 5 Undocking: | December 2, 2002 | ISS Crew 5 Landing: | December 7, 2002 |
| ISS Crew 5: | CDR Valeri Korzun (Russia) <> FE1 Peggy Whitson (USA) <> FE2 Sergei Treshchyov (Russia) |
||
| Left off the ISS Crew 6 | |||
| ISS Crew 6 Launch: | November 23, 2002 | ISS Crew 6 Docking: | November 25, 2002 |
| ISS Crew 6 Undocking: | May 3, 2003 | ISS Crew 6 Landing: | May 4, 2003 |
| ISS Crew 6: | CDR Kenneth Bowersox (USA) <> FE1 Nikolai Budarin (Russia) <> FE2 Donald Pettit (USA) |
||
| Spacewalks from Discovery on ISS Logistics Flight LF-1 (STS-114) | |||
|---|---|---|---|
| STS-114 Launch: | July 26, 2005 | STS-114 Docking: | July 28, 2005 |
| STS-114 Undocking: | August 6, 2005 | STS-114 Landing: | August 9, 2005 |
| Spacewalkers: | Soichi Noguchi (STS-114) <> Stephen Robinson (STS-114) | ||
| STS-114 Crew: | CDR Eileen Collins <> PLT James Kelly <> MS1 Soichi Noguchi (Japan) <> MS2 Stephen Robinson <> MS3 Andrew Thomas <> MS4 Wendy Lawrence <> MS5 Charles Camarda |
||
| STS-114 Spacewalk 1 | Noguchi and Robinson installed an attachment device for the External Storage Platform-2 on the Quest Airlock, rerouted power to Control Movement Gyro-2, replaced a GPS antenna, and retrieved two Materials International Space Station Experiment panels from the Quest Airlock. The highlight of the spacewalk was a demonstration of two new methods to repair the Space Shuttle's thermal protection system. | ||
| Shuttle Airlock | |||
| July 30, 2005 | |||
| Length: 6 hours 50 minutes | |||
| Start: 09:46 GMT | |||
| End: 16:36 GMT | |||
| STS-114 Spacewalk 2 | Noguchi and Robinson replaced Control Movement Gyro-1, which failed on June 8, 2002 during the STS-111 mission. | ||
| Shuttle Airlock | |||
| August 1, 2005 | |||
| Length: 7 hours 14 minutes | |||
| Start: 08:42 GMT | |||
| End: 15:56 GMT | |||
| STS-114 Spacewalk 3 | Noguchi and Robinson installed a new Materials International Space Station Experiment (MISSE-5) panel on the P6 Truss Segment. They also installed the External Storage Platform-2 on the Quest Airlock, and removed two gap fillers from Discovery's heat shield. | ||
| Shuttle Airlock | |||
| August 3, 2005 | |||
| Length: 6 hours 1 minute | |||
| Start: 08:48 GMT | |||
| End: 14:49 GMT | |||
| Visited the ISS Crew 11 | |||
| ISS Crew 11 Launch: | April 15, 2005 | ISS Crew 11 Docking: | April 17, 2005 |
| ISS Crew 11 Undocking: | October 10, 2005 | ISS Crew 11 Landing: | October 11, 2005 |
| ISS Crew 11: | CDR Sergei Krikalyov (Russia) <> FE John Phillips (USA) | ||
| Spacewalks by the STS-121 crew on ISS Utilization and Logistics Flight ULF-1.1 | |||
|---|---|---|---|
| STS-121 Launch: | July 4, 2006 | STS-121 Docking: | July 6, 2006 |
| STS-121 Undocking: | July 15, 2006 | STS-121 Landing: | July 17, 2006 |
| Spacewalkers: | Michael Fossum (STS-121) <> Piers Sellers (STS-121) | ||
| STS-121 Crew: | CDR Steven Lindsey <> PLT Mark Kelly <> MS1 Michael Fossum <> MS2 Lisa Nowak <> MS3 Stephanie Wilson <> MS4 Piers Sellers |
||
| STS-121 Spacewalk 1 | Fossum and Sellers tested the ability of the 50-foot Orbiter Boom Sensor System to support astronauts as a work platform, after replacing the zenith Integrated Umbilical Assembly on the Mobile Transporter. | ||
| Quest Airlock | |||
| July 8, 2006 | |||
| Length: 7 hours 31 minutes | |||
| Start: 13:17 GMT | |||
| End: 20:49 GMT | |||
| STS-121 Spacewalk 2 | Fossum and Sellers replaced the Trailing Umbilical System on the Mobile Transporter, and installed a spare pump module on External Stowage Platform 2. | ||
| Quest Airlock | |||
| July 10, 2006 | |||
| Length: 6 hours 47 minutes | |||
| Start: 12:14 GMT | |||
| End: 19:02 GMT | |||
| STS-121 Spacewalk 3 | Fossum and Sellers tested heat shield repair methods. | ||
| Quest Airlock | |||
| July 12, 2006 | |||
| Length: 7 hours 11 minutes | |||
| Start: 11:20 GMT | |||
| End: 18:31 GMT | |||
| Left off the third ISS Crew 13 crew member (Thomas Reiter - Astrolab Mission) | |||
| Astrolab Launch: | July 4, 2006 | Astrolab Docking: | July 6, 2006 |
| Astrolab Undocking: | December 18, 2006 | Astrolab Landing: | December 22, 2006 |
| ISS Crew 13: | CDR Pavel Vinogradov (Russia) <> FE1 Jeffrey Williams (USA) <> FE2 Thomas Reiter (Germany - Astrolab Mission) (Up - STS-121 / Down - STS-116) |
||
| Spacewalks by the STS-115 crew on ISS Assembly Flight 12A | |||
|---|---|---|---|
| STS-115 Launch: | September 9, 2006 | STS-115 Docking: | September 11, 2006 |
| STS-115 Undocking: | September 17, 2006 | STS-115 Landing: | September 21, 2006 |
| Spacewalkers: | Heidemarie Stefanyshyn-Piper (STS-115) <> Joseph Tanner (STS-115) <> Daniel Burbank (STS-115) <> Steve MacLean (STS-115) |
||
| STS-115 Crew: | CDR Brent Jett <> PLT Christopher Ferguson <> MS1 Joseph Tanner <> MS2 Daniel Burbank <> MS3 Heidemarie Stefanyshyn-Piper <> MS4 Steve MacLean (Canada) |
||
| STS-115 Spacewalk 1 | Tanner and Stefanyshyn-Piper connected power and data cables between P3 Truss Segment and P1 Truss Segment, prepared solar arrays for deployment, and started work to activate the Solar Alpha Rotary Joint. | ||
| Quest Airlock | |||
| September 12, 2006 | |||
| Length: 6 hours 26 minutes | |||
| Start: 09:17 GMT | |||
| End: 15:43 GMT | |||
| STS-115 Spacewalk 2 | Burbank and MacLean finished work to activate the Solar Alpha Rotary Joint. | ||
| Quest Airlock | |||
| September 13, 2006 | |||
| Length: 7 hours 11 minutes | |||
| Start: 09:05 GMT | |||
| End: 16:16 GMT | |||
| STS-115 Spacewalk 3 | Tanner and Stefanyshyn-Piper replaced the S-Band Subassembly Antenna, retrieved the Materials International Space Station Experiment from the P6 Truss Segment, and prepared the P4 radiator for deployment. | ||
| Quest Airlock | |||
| September 15, 2006 | |||
| Length: 6 hours 42 minutes | |||
| Start: 10:00 GMT | |||
| End: 16:42 GMT | |||
| Visited the ISS Crew 13 | |||
| Soyuz TMA-8 Launch: | March 30, 2006 | Soyuz TMA-8 Docking: | April 1, 2006 |
| STS-121 Launch: | July 4, 2006 | STS-116 Landing: | December 22, 2006 |
| Soyuz TMA-8 Undocking: | September 29, 2006 | Soyuz TMA-8 Landing: | September 29, 2006 |
| ISS Crew 13: | CDR Pavel Vinogradov (Russia) <> FE1 Jeffrey Williams (USA) <> FE2 Thomas Reiter (Germany - Astrolab Mission) (Up - STS-121 / Down - STS-116) |
||
| Spacewalks by the STS-116 crew on ISS Assembly Flight 12A.1 | |||
|---|---|---|---|
| STS-116 Launch: | December 10, 2006 | STS-115 Docking: | December 11, 2006 |
| STS-116 Undocking: | December 18, 2006 | STS-115 Landing: | December 22, 2006 |
| Spacewalkers: | Robert Curbeam (STS-116) <> Christer Fuglesang (STS-116) <> Sunita Williams (ISS Crew 14) |
||
| STS-116 Crew: | CDR Mark Polansky <> PLT William Oefelein <> MS1 Nicholas Patrick <> MS2 Robert Curbeam <> MS3 Christer Fuglesang (Sweden) <> MS4 Joan Higginbotham |
||
| STS-116 Spacewalk 1 | Curbeam and Fuglesang installed the P5 Truss Segment to the P3/P4 Truss Segments, stowed a grapple fixture used for the P5 installation, and replaced a camera on the S1 Truss Segment. | ||
| Quest Airlock | |||
| December 12 - 13, 2006 | |||
| Length: 6 hours 36 minutes | |||
| Start: 20:31 GMT (Dec. 12) | |||
| End: 03:07 GMT (Dec. 13) | |||
| STS-116 Spacewalk 2 | Curbeam and Fuglesang rewired electric channels 2/3, and relocated two Crew and Equipment Translation Aid carts. | ||
| Quest Airlock | |||
| December 14 - 15, 2006 | |||
| Length: 5 hours 0 minutes | |||
| Start: 19:41 GMT (Dec. 14) | |||
| End: 00:41 GMT (Dec. 15) | |||
| STS-116 Spacewalk 3 | Curbeam and Williams rewired electric channels 1/4, and transferred three Service Module Debris Panels to Pressurized Mating Adapter 3. They also inspected the port solar array on the P6 Truss Segment, and shook the storage box to help with retracting the port solar array. | ||
| Quest Airlock | |||
| December 16 - 17, 2006 | |||
| Length: 7 hours 31 minutes | |||
| Start: 19:25 GMT (Dec. 16) | |||
| End: 02:56 GMT (Dec. 17) | |||
| STS-116 Spacewalk 4 | Curbeam and Fuglesang helped to finish the retraction of the port solar array of the P6 Truss Segment. | ||
| Quest Airlock | |||
| December 18 - 19, 2006 | |||
| Length: 6 hours 38 minutes | |||
| Start: 19:00 GMT (Dec. 18) | |||
| End: 01:38 GMT (Dec. 19) | |||
| Visited the ISS Crew 14 | |||
| Soyuz TMA-9 Launch: | September 18, 2006 | Soyuz TMA-9 Docking: | September 20, 2006 |
| STS-116 Launch: | December 10, 2006 | STS-117 Landing: | June 22, 2007 |
| Soyuz TMA-9 Undocking: | April 21, 2007 | Soyuz TMA-9 Landing: | April 21, 2007 |
| ISS Crew 14: | CDR Michael Lopez-Alegria (USA) <> FE1 Mikhail Tyurin (Russia) <> FE2 Sunita Williams (USA) (Up - STS-116 / Down - STS-117) |
||
| Key | |
|---|---|
| CDR | Commander |
| PLT | Pilot |
| FE | Flight Engineer |
| MS | Mission Specialist |
Return to the Index of Spacewalks by Manned Space Program
Updated - November 19, 2008