Name: Seller, Piers Country: USA M/F: M Number of Flights: 3

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-112 October 7, 2002 - Atlantis October 18, 2002 - Atlantis
2. STS-121 July 4, 2006 - Discovery July 17, 2006 - Discovery
3. STS-132 May 2010 - Discovery May 2010 - Discovery

Space Flights Descriptions
1. STS-112 ISS Assembly Mission 9A
Delivered the S1 Truss Segment on October 10, 2002 - Atlantis docked with the International Space Station (ISS) from October 9, 2002 to October 16, 2002.
2. STS-121 ISS Utilization and Logistics Flight ULF-1.1
Deliver supplies in the Leonardo Multi-Purpose Logistics Module, and perform other tasks left from the STS-114 mission - Piers Seller replaced Carlos Noriega due to a temporary medical problem. - Discovery docked with the International Space Station (ISS) from July 6, 2006 to July 15, 2006.
STS-120
(Original Crew)
ISS Assembly Mission 10A
The goal was to deliver Node 2 to the International Space Station (ISS). Piers Seller was a member of the original STS-120 crew, and was transferred to the STS-121 mission.
3. STS-132 ISS Utilization and Logistics Flight Flight ULF-4 (Scheduled)
Deliver the Russian-built Mini Research Module-1 (MRM-1)

Spacewalks - 6
Space Flights Date & Duration Purpose
STS-112 October 10, 2002 International Space Station Assembly - Connect power, data and fluid lines between the S1 and S0 Truss Segments. Install new S-band antenna and first set of external cameras. Release launch restraints
7 hours 1 minute
STS-112 October 12, 2002 International Space Station Assembly - Connect ammonia cooling lines. Prepare the Crew and Equipment Translation Aid cart for future use. Install Spool Positioning Devices, and additional set of external cameras on the Destiny Laboratory
6 hours 4 minutes
STS-112 October 14, 2002 International Space Station Assembly - Remove a bolt preventing activation of a cable cutter on the Mobile Transporter. Connect ammonia lines between the S1 and S0 Truss Segments. Install additional Spool Positioning Devices
6 hours 36 minutes

STS-121 July 8, 2006 International Space Station Assembly - Test the ability of the 50-foot Orbiter Boom Sensor System to support astronauts as a work platform. Replace the zenith Integrated Umbilical Assembly on the Mobile Transporter
7 hours 31 minutes
STS-121 July 10, 2006 International Space Station Assembly - Replace the Trailing Umbilical System on the Mobile Transporter. Install a spare pump module on External Stowage Platform 2
6 hours 47 minutes
STS-121 July 12, 2006 International Space Station Assembly - Test heat shield repair methods
7 hours 11 minutes

Return to Master List American Astronauts Spacewalkers Three Spaceflights
International Space Station Program - Phase III - 2002 / Phase III - 2006 / Scheduled

Updated - May 28, 2009