Name: Satcher, Robert "Bobby" Country: USA M/F: M Number of Flights: 1

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-129 November 16, 2009 - Atlantis November 27, 2009 - Atlantis

Space Flights Descriptions
1. STS-129 ISS Utilization and Logistics Flight Flight ULF-3
Deliver spare parts on ELC 1 and ELC 2 (ELC - ExPRESS Logistics Carrier) - Atlantis docked with the International Space Station (ISS) from November 18, 2009 to November 25, 2009.

Spacewalks - 1
Space Flights Date & Duration Purpose
STS-129 November 19, 2009 International Space Station Assembly - Install a spare S-band antenna structural assembly on the Z1 Truss Segment, and redundant space-to-ground antenna cabling. Replace a handrail with an ammonia line routing bracket on the Unity node. Reposition a local area network cable on the Zarya module, and troubleshoot a cable connector on a panel on the S0 Truss Segment. Lubricate the Payload Orbital Replacement Unit Accommodation on the Mobile Base System and the latching end effector of the Japanese robotic arm. Set up the lower/outboard Payload Attachment System (PAS) on the S3 Truss Segment
6 hours 37 minutes
STS-129 November 23, 2009 International Space Station Assembly - Install the seventh Materials International Space Station Experiment (MISSE) on the ExPRESS Logistics Carrier (ELC) 2. Transfer a high pressure gas tank from the ELC 2 to the Quest Airlock. Deploy the the upper/inboard Payload Attachment System (PAS) on the S3 Truss Segment
(Scheduled)

Return to Master List American Astronauts One Spaceflight
International Space Station Program - Phase IV - 2009 Spacewalkers

Updated - November 19, 2009