Name: Patrick, Nicholas Country: USA M/F: M Number of Flights: 2

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-116 December 10, 2006 - Discovery December 22, 2006 - Discovery
2. STS-130 February 8, 2010 - Endeavour February 22, 2010 - Endeavour

Space Flights Descriptions
1. STS-116 ISS Assembly Mission 12A.1
Delivered the P5 Truss Segment on December 12, 2006 - Discovery docked with the International Space Station (ISS) from December 11, 2006 to December 19, 2006.
2. STS-130 ISS Assembly Mission 20A
Delivered the Tranquility (Node 3) and Cupola modules on February 12, 2010 - Endeavour docked with the International Space Station (ISS) from February 10, 2010 to February 20, 2010.

Spacewalks - 3
Space Flights Date & Duration Purpose
STS-130 February 12, 2010 International Space Station Assembly - Prepare the Tranquility module for attachment to the International Space Station. Remove the temporary storage platform from Dextre and store on the station's truss. Connect temporary heating cables and avionics cables to the Tranquility module
6 hours 32 minutes
STS-130 February 14, 2010 International Space Station Assembly - Install insulations covers on trunnions and keel pin on the Tranquillity module. Connect ammonia lines to the Tranquility module. Install an atmospheric control and resupply system vent relief valve and eight handrails on the Tranquility module
5 hours 54 minutes
STS-130 February 17, 2010 International Space Station Assembly - Connect heater and data cables to Pressurized Mating Adapter 3. Open ammonia flow to the Tranquility module. Disconnect temporary heating cables from the Tranquility module. Remove insulation covers from the Cupola. Release launch locks from the Cupola window covers. Install handrails, worksite interfaces and gap spanners on the Tranquility module
5 hours 48 minutes

Return to Master List American Astronauts Two Spaceflights Spacewalkers
International Space Station Program - Phase III - 2006 / Phase IV - 2010

Updated - February 18, 2010