| Spacewalks - 5 |
| STS-117 |
June 11, 2007 |
International Space Station Assembly - Connect power and data cables between
S3 Truss Segment and S1 Truss Segment. Prepare solar arrays for deployment.
Start work to activate Solar Alpha Rotary Joint. Prepare radiator for deployment |
| 6 hours 15 minutes |
| STS-117 |
June 15, 2007 |
International Space Station Assembly - Install hydrogen vent value on the
Destiny Laboratory. Repair thermal blanket on the left-side Orbiter Maneuvering
System pod. Help retract the starboard solar array of the P6 Truss Segment |
| 7 hours 58 minutes |
|
| STS-128 |
September 1, 2009 |
International Space Station Assembly - Remove an old ammonia tank assembly.
Retrieve the European Technology Exposure Facility (EuTEF) and the sixth
Materials International Space Station Experiment (MISSE) |
| 6 hours 35 minutes |
| STS-128 |
September 3, 2009 |
International Space Station Assembly - Install a new ammonia tank assembly.
Store the old ammonia tank assembly in Discovery's payload bay. Install
a lens cover on a camera on the Canadarm2 |
| 6 hours 39 minutes |
| STS-128 |
September 5, 2009 |
International Space Station Assembly - Deploy the upper Payload Attachment
System (PAS) on the S3 Truss Segment. Replace a rate gyro assembly and
remote power control module on the S0 Truss Segment. Start work to prepare
the Unity module of the arrival of the Tranquility module on the STS-130
mission |
| 7 hours 1 minute |