| Spacewalks - 6 |
| Space Flights |
Date & Duration |
Purpose |
| STS-109 |
March 4, 2002 |
Repair Hubble Space Telescope - Replace old starboard solar array with
new third-generation solar array. Replace associated Diode Box Assembly
with starboard solar array |
| 7 hours 1 minute |
| STS-109 |
March 6, 2002 |
Repair Hubble Space Telescope - Replace Power Control Unit |
| 6 hours 48 minutes |
| STS-109 |
March 8, 2002 |
Repair Hubble Space Telescope - Install the new NICMOS Cryogenic Cooler
and its Cooling System Radiator to revive the Near Infrared Camera and
Multi-Object Spectrometer (NICMOS) |
| 7 hours 20 minutes |
|
| STS-123 |
March 14, 2008 |
International Space Station Assembly - Prepare the Experiment Logistics
Module-Pressurized Section of the Kibo Laboratory for installation on to
the International Space Station. Install the Orbital Replacement Unit tool
change out mechanisms on Dextre |
| 7 hours 1 minute |
| STS-123 |
March 15, 2008 |
International Space Station Assembly - Install the arms on Dextre |
| 7 hours 8 minutes |
| STS-123 |
March 17, 2008 |
International Space Station Assembly - Outfit Dextre with its tool platform,
tool holster assembly, and Camera Light Pan Tilt Assembly. Prepare the
Spacelab Logistics Pallet for return to Earth. Transfer three spare units
to the International Space Station |
| 6 hours 53 minutes |