| Spacewalks - 6 |
| Space Flights |
Date & Duration |
Purpose |
| STS-121 |
July 8, 2006 |
International Space Station Assembly - Test the ability of the 50-foot
Orbiter Boom Sensor System to support astronauts as a work platform. Replace
the zenith Integrated Umbilical Assembly on the Mobile Transporter |
| 7 hours 31 minutes |
| STS-121 |
July 10, 2006 |
International Space Station Assembly - Replace the Trailing Umbilical System
on the Mobile Transporter. Install a spare pump module on External Stowage
Platform 2 |
| 6 hours 47 minutes |
| STS-121 |
July 12, 2006 |
International Space Station Assembly - Test heat shield repair methods |
| 7 hours 11 minutes |
|
| STS-124 |
June 3, 2008 |
International Space Station Assembly - Retrieve the Orbiter Boom Sensor
System from the International Space Station. Prepare the Kibo Experiment
Module for installation onto the International Space Station. Inspect the
starboard Solar Alpha Rotary Joint and test cleaning methods |
| 6 hours 48 minutes |
| STS-124 |
June 5, 2008 |
International Space Station Assembly - Install TV cameras on Kibo. Remove
thermal covers from the Japanese robotic arm. Prepare worksite for replacing
an empty Nitrogen Tank Assembly. Inspect the port Solar Alpha Rotary Joint |
| 7 hours 11 minutes |
| STS-124 |
June 8, 2008 |
International Space Station Assembly - Replace an empty Nitrogen Tank Assembly
on the S1 Truss Segment with a full spare. Remove thermal covers from the
Japanese robotic arm. Retrieve samples from the port Solar Alpha Rotary
Joint |
| 6 hours 33 minutes |