| Name: Foreman, Michael | Country: USA | M/F: M | Number of Flights: 2 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-123 | March 11, 2008 - Endeavour | March 27, 2008 - Endeavour |
| 2. STS-129 | November 16, 2009 - Atlantis | November 27, 2009 - Atlantis |
| Space Flights | Descriptions |
|---|---|
| STS-120 (Original Crew) |
ISS Assembly Mission 10A The goal was to deliver Node 2 to the International Space Station (ISS). Michael Foreman was a member of the original STS-120 crew, and was transferred to the STS-123 mission. |
| 1. STS-123 | ISS Assembly Mission 1J/A Delivered the Kibo Experiment Logistics Module's Pressurized Section on March 13, 2008 - Endeavour docked with the International Space Station (ISS) from March 13, 2008 to March 25, 2008. |
| 2. STS-129 | ISS Utilization and Logistics Flight Flight ULF-3 Delivered spare parts on ELC 1 and ELC 2 (ELC - ExPRESS Logistics Carrier) - Atlantis docked with the International Space Station (ISS) from November 18, 2009 to November 25, 2009. |
| Spacewalks - 5 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-123 | March 15, 2008 | International Space Station Assembly - Install the arms on Dextre |
| 7 hours 8 minutes | ||
| STS-123 | March 20, 2008 | International Space Station Assembly - Replace a failed Remote Power Controller Module on the station's truss. Perform the T-RAD Detailed Test Objective (DTO) 848 to test heat shield repair techniques |
| 6 hours 24 minutes | ||
| STS-123 | March 22, 2008 | International Space Station Assembly - Temporary stow the Orbiter Boom Sensor System on the S1 Truss Segment. Conduct additional inspections of the starboard Solar Alpha Rotary Joint. Install two Materials International Space Station Experiment panels (MISSE-6) on the Columbus Laboratory |
| 6 hours 2 minutes | ||
|
|
||
| STS-129 | November 19, 2009 | International Space Station Assembly - Install a spare S-band antenna structural assembly on the Z1 Truss Segment, and redundant space-to-ground antenna cabling. Replace a handrail with an ammonia line routing bracket on the Unity node. Reposition a local area network cable on the Zarya module, and troubleshoot a cable connector on a panel on the S0 Truss Segment. Lubricate the Payload Orbital Replacement Unit Accommodation on the Mobile Base System and the latching end effector of the Japanese robotic arm. Set up the lower/outboard Payload Attachment System (PAS) on the S3 Truss Segment |
| 6 hours 37 minutes | ||
| STS-129 | November 21, 2009 | International Space Station Assembly - Install a Grappling Adaptor to ON-Orbit Railing (GATOR) assembly. Relocate a floating potential measurement unit from the S1 Truss Segment to the P1 Truss Segment. Deploy the remaining two Payload Attachment Systems (PAS) on the S3 Truss Segment. Install a wireless video system external transceiver assembly on the S3 Truss Segment |
| 6 hours 8 minutes | ||
| Return to Master List | American Astronauts | Two Spaceflights | Spacewalkers |
| International Space Station Program - Phase IV - 2008 / Phase IV - 2009 | |||
Updated - November 21, 2009