Name: Bresnik, Randolph Country: USA M/F: M Number of Flights: 1

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-129 November 16, 2009 - Atlantis November 27, 2009 - Atlantis

Space Flights Descriptions
1. STS-129 ISS Utilization and Logistics Flight Flight ULF-3
Deliver spare parts on ELC 1 and ELC 2 (ELC - ExPRESS Logistics Carrier) - Atlantis docked with the International Space Station (ISS) from November 18, 2009 to November 25, 2009.

Spacewalks - 0
Space Flights Date & Duration Purpose
STS-129 November 21, 2009 International Space Station Assembly - Install a Grappling Adaptor to ON-Orbit Railing (GATOR) assembly. Relocate a floating potential measurement unit from the S1 Truss Segment to the P1 Truss Segment. Set up the lower/inboard Payload Attachment System (PAS) on the S3 Truss Segment. Install a wireless video system external transceiver assembly on the S3 Truss Segment
(Scheduled)
STS-129 November 23, 2009 International Space Station Assembly - Install the seventh Materials International Space Station Experiment (MISSE) on the ExPRESS Logistics Carrier (ELC) 2. Transfer a high pressure gas tank from the ELC 2 to the Quest Airlock. Deploy the the upper/inboard Payload Attachment System (PAS) on the S3 Truss Segment
(Scheduled)

Return to Master List American Astronauts One Spaceflight
International Space Station Program - Phase IV - 2009 Spacewalkers

Updated - November 18, 2009