Name: Behnken, Robert Country: USA M/F: M Number of Flights: 2

Space Flights Launch Date - Shuttle Launch Date - Shuttle
1. STS-123 March 11, 2008 - Endeavour March 27, 2008 - Endeavour
2. STS-130 February 2010 - Endeavour February 2010 - Endeavour

Space Flights Descriptions
1. STS-123 ISS Assembly Mission 1J/A
Delivered the Kibo Experiment Logistics Module's Pressurized Section on March 13, 2008 - Endeavour docked with the International Space Station (ISS) from March 13, 2008 to March 25, 2008.
2. STS-130 ISS Assembly Mission 20A (Scheduled)
Deliver the Node 3 and Cupola modules

Spacewalks - 3
Space Flights Date & Duration Purpose
STS-123 March 17, 2008 International Space Station Assembly - Outfit Dextre with its tool platform, tool holster assembly, and Camera Light Pan Tilt Assembly. Prepare the Spacelab Logistics Pallet for return to Earth. Transfer three spare units to the International Space Station
6 hours 53 minutes
STS-123 March 20, 2008 International Space Station Assembly - Replace a failed Remote Power Controller Module on the station's truss. Perform the T-RAD Detailed Test Objective (DTO) 848 to test heat shield repair techniques
6 hours 24 minutes
STS-123 March 22, 2008 International Space Station Assembly - Temporary stow the Orbiter Boom Sensor System on the S1 Truss Segment. Conduct additional inspections of the starboard Solar Alpha Rotary Joint. Install two Materials International Space Station Experiment panels (MISSE-6) on the Columbus Laboratory
6 hours 2 minutes

Return to Master List American Astronauts Two Spaceflights Spacewalkers
International Space Station Program - Phase IV - 2008 / Scheduled

Updated - February 15, 2009