Name: Behnken, Robert Country: USA M/F: M Number of Flights: 2

Space Flights Launch Date - Shuttle Launch Date - Shuttle
1. STS-123 March 11, 2008 - Endeavour March 27, 2008 - Endeavour
2. STS-130 February 8, 2010 - Endeavour February 22, 2010 - Endeavour

Space Flights Descriptions
1. STS-123 ISS Assembly Mission 1J/A
Delivered the Kibo Experiment Logistics Module's Pressurized Section on March 13, 2008 - Endeavour docked with the International Space Station (ISS) from March 13, 2008 to March 25, 2008.
2. STS-130 ISS Assembly Mission 20A
Delivered the Tranquility (Node 3) and Cupola modules on February 12, 2010 - Endeavour docked with the International Space Station (ISS) from February 10, 2010 to February 20, 2010.

Spacewalks - 6
Space Flights Date & Duration Purpose
STS-123 March 17, 2008 International Space Station Assembly - Outfit Dextre with its tool platform, tool holster assembly, and Camera Light Pan Tilt Assembly. Prepare the Spacelab Logistics Pallet for return to Earth. Transfer three spare units to the International Space Station
6 hours 53 minutes
STS-123 March 20, 2008 International Space Station Assembly - Replace a failed Remote Power Controller Module on the station's truss. Perform the T-RAD Detailed Test Objective (DTO) 848 to test heat shield repair techniques
6 hours 24 minutes
STS-123 March 22, 2008 International Space Station Assembly - Temporary stow the Orbiter Boom Sensor System on the S1 Truss Segment. Conduct additional inspections of the starboard Solar Alpha Rotary Joint. Install two Materials International Space Station Experiment panels (MISSE-6) on the Columbus Laboratory
6 hours 2 minutes

STS-130 February 12, 2010 International Space Station Assembly - Prepare the Tranquility module for attachment to the International Space Station. Remove the temporary storage platform from Dextre and store on the station's truss. Connect temporary heating cables and avionics cables to the Tranquility module
6 hours 32 minutes
STS-130 February 14, 2010 International Space Station Assembly - Install insulations covers on trunnions and keel pin on the Tranquillity module. Connect ammonia lines to the Tranquility module. Install an atmospheric control and resupply system vent relief valve and eight handrails on the Tranquility module
5 hours 54 minutes
STS-130 February 17, 2010 International Space Station Assembly - Connect heater and data cables to Pressurized Mating Adapter 3. Open ammonia flow to the Tranquility module. Disconnect temporary heating cables from the Tranquility module. Remove insulation covers from the Cupola. Release launch locks from the Cupola window covers. Install handrails, worksite interfaces and gap spanners on the Tranquility module
5 hours 48 minutes

Return to Master List American Astronauts Two Spaceflights Spacewalkers
International Space Station Program - Phase IV - 2008 / Phase IV - 2010

Updated - February 18, 2010