| Spacewalks - 6 |
| Space Flights |
Date & Duration |
Purpose |
| STS-123 |
March 17, 2008 |
International Space Station Assembly - Outfit Dextre with its tool platform,
tool holster assembly, and Camera Light Pan Tilt Assembly. Prepare the
Spacelab Logistics Pallet for return to Earth. Transfer three spare units
to the International Space Station |
| 6 hours 53 minutes |
| STS-123 |
March 20, 2008 |
International Space Station Assembly - Replace a failed Remote Power Controller
Module on the station's truss. Perform the T-RAD Detailed Test Objective
(DTO) 848 to test heat shield repair techniques |
| 6 hours 24 minutes |
| STS-123 |
March 22, 2008 |
International Space Station Assembly - Temporary stow the Orbiter Boom
Sensor System on the S1 Truss Segment. Conduct additional inspections of
the starboard Solar Alpha Rotary Joint. Install two Materials International
Space Station Experiment panels (MISSE-6) on the Columbus Laboratory |
| 6 hours 2 minutes |
|
| STS-130 |
February 12, 2010 |
International Space Station Assembly - Prepare the Tranquility module for
attachment to the International Space Station. Remove the temporary storage
platform from Dextre and store on the station's truss. Connect temporary
heating cables and avionics cables to the Tranquility module |
| 6 hours 32 minutes |
| STS-130 |
February 14, 2010 |
International Space Station Assembly - Install insulations covers on trunnions
and keel pin on the Tranquillity module. Connect ammonia lines to the Tranquility
module. Install an atmospheric control and resupply system vent relief
valve and eight handrails on the Tranquility module |
| 5 hours 54 minutes |
| STS-130 |
February 17, 2010 |
International Space Station Assembly - Connect heater and data cables to
Pressurized Mating Adapter 3. Open ammonia flow to the Tranquility module.
Disconnect temporary heating cables from the Tranquility module. Remove
insulation covers from the Cupola. Release launch locks from the Cupola
window covers. Install handrails, worksite interfaces and gap spanners
on the Tranquility module |
| 5 hours 48 minutes |